XXL distribution centre Lelystad

Projects / 04

XXL distribution centre Lelystad

Pouring and power floating the floors of an XXL distribution centre in Lelystad, with 25 concrete workers and our own power floats.

Client
Dura Vermeer
Location
Lelystad
Start
2017
Completion
2020
Duration
4 years

Scope of work

Concrete pouring, power floating and all-round concrete work. 25 all-round concrete workers and power floats.

What does your
site need next?

Get in touch to discuss your needs, get a quote or arrange a site visit.

Talk to Repbet

“Kris can always switch quickly and delivers what he promises. I regularly call on Repbet when I need various roles on the building site.”

Dylan BakkerCivil Site Manager · Dura Vermeer Infra Landelijke Projecten
Talk to Repbet